Preparing to Build a Home in Marbella: From Plot to Groundbreaking

29 / 10 / 2026
Preparing to Build a Home in Marbella: From Plot to Groundbreaking

Building a house in Marbella starts long before machinery arrives on the plot. How well the start is prepared determines the programme, the budget and the number of unpleasant surprises on site. That matters even more for clients who live in another country and cannot visit every week.

We have put together a preparation checklist: what to do, and in what order, before starting construction on the Costa del Sol. It is based on our own projects and on the questions clients ask most often at the first meeting.

1. The plot

  • a topographic survey and a geotechnical study — they determine the foundations and the volume of earthworks;
  • access for machinery and utility connections: water, power and drainage;
  • the plot’s orientation, sea views and neighbouring buildings;
  • the gradient: a sloping plot will need retaining walls and terraces.

If you have not bought the plot yet, it is worth asking a builder to visit before you sign: a few hours on site can steer you away from plots where foundations and earthworks would swallow a large share of the budget.

2. The project team

The architect, the engineers and the main contractor should work together from the very beginning. That way the design reflects the construction method and the budget from the outset, instead of being redrawn after the first cost estimate. It helps when the team has a single coordinator who speaks the client’s language.

3. Design and cost plan

Construction drawings, a detailed cost plan and a programme are the three documents you should not start without. A good cost plan is broken down by stage and trade, and the programme shows when the client’s decisions will be needed: windows, finishes, equipment and sanitaryware.

4. Budget and contingency

Set aside a contingency for unforeseen work and agree in advance how changes will be approved. Budgets most often move not because of mistakes but because of new wishes from the client during the build, so it is important to see straight away how each change affects the programme.

5. The contractor and the contract

  • a fixed scope of works and a programme with milestones;
  • a procedure for signing off and paying for each stage;
  • guarantees on workmanship and materials;
  • the format and frequency of reporting.
“The best start to a build is when the client knows what will happen over the next three months and which decisions they will need to make.” — ARTECON Project Manager

6. Remote oversight

If you will follow the build from another country, agree the reporting format in advance: photos, video, weekly summaries and video calls from site. If needed, bring in site supervision and project management — a specialist who signs off the works on your behalf.

7. Plans for the future

Think about how the house will be used in five to ten years: the family may grow, or the house may be let or sold. Spare capacity in the building services and a flexible layout cost less now than alterations later.

How long preparation takes

From buying a plot to starting construction usually takes four to eight months. Surveys take a few weeks, the concept design one to two months, and the construction drawings and cost plan another two to three. This time is not lost: the better the design is worked out, the faster and smoother the build.

Which documents to keep

  • topographic survey and geotechnical results;
  • the approved design and every revision;
  • the cost plan and the contract with its appendices;
  • the programme and meeting minutes;
  • the photo archive of concealed work and stage sign-off records.

This archive will be useful for maintenance, insurance and any future sale.

Conclusion